By Michael Chen janvier 17, 2017 Company News No Comments RIGITEC seamless pipe line in Brazil completed commissioning on January 17th. The production line mainly produces 33.4-114.3mm seamless pipes and its annual capacity is 50,000T. Share: Previous New Rolling Line Turnkey Contract signed in Ethiopia Next Technical Meeting Was Fruitful in Nigeria