About Project
With the design capacity up to 300,000t/year, it is SME’s turnkey project under construction till 2020. It adopts 120*120*6000mm, 125*125*6000mm, 150*150*6000mm billets as raw materials, and excellent equipment configuration to produce rebar Ø8mm-Ø32mm, wire rod Ø5.5mm,Ø6mm.



Main Equipment Configuration
- 60t/h reheating furnace
- 5-stand rebar roughing mill
- 10-stand intermediate mill
- 8-stand finishing mill
- GK1-GK6 wire rod block mill
- other facilities