Ethiopia 180,000TPA Rebar & High-speed Wire Rod Plant

project details

Type: Turnkey Project
Capcity: 180,000TPA
Product: Rebar & Wire Rod
Year: 2013
Duration: 1 Year
Location: Ethiopia
Status: Operating Smoothly

Brochure

Download our document to see specific data of the service and how we work.

BROCHURE.PDF
3.81M

Get Your Tailored
Solution Now!

Please feel free to contact us. We will get back to you with 1-2 business days. Or just call us now.

About Project

Turnkey Project with a capacity of 180,000 tons/year. The project is complete and continuously operating to date.

Raw Materials: 120*120*6000mm, 125*125*6000mm & 150*150*6000mm.

Main Equipment Configuration

The wire rod block mill unit is equipped with 6- stands of 45°top cross non-twist finishing mills.
The advantages of this unit include its lightweight design, minimal vibration, and ease of operation. As a result, it enhances product precision and ensures high-quality output. The rolling line’s maximum speed reaches up to 35m/s.

Get Free Quotation Now